 Two washers with bowl-shaped dredging can be in case of need established. 
Adjustment of the bearing element of components of a door 
The window and framework of a door have to be adjusted too. 
 
 |   PERFORMANCE ORDER   | 
  
 
 
 
 
 | 
  | 
 1) weaken bolts | 
  
 
 | 2) close a door  | 
  
 
 |  3) press on the bearing element of components of a door in the direction opposite to a roof and a rack | 
  
 
 | 4) the assistant has to tighten at first the lower, and then top bolts | 
  
 
 | 5) 20 N. of m. | 
  
 
 | 6) be convinced that the bearing element is established, having pressed on top stronger | 
  
 
 | 7) do not press a door framework | 
  
 
 | 8) check all sizes | 
  
  
  | 
  
 
 Holder of components of a door, sizes 
 
 | 
 
  | 
 in the drawing the cross section of the left door is shown 
   with = 3.5 + 1 mm  d = 8.1 + 1 mm   1 – sealing flange  2 – door frame  3 – decorative overlay of a door  4 – window  5 – window sealing laying  6 – internal door sealing laying  7 – sealant   8 – a sealant at a window  | 
  
 
  the sealing edge 7 has to have contact on all contour of a rack and a decorative overlay of a roof 3  
  the external sealing flange of a window 8 should not support a decorative overlay of a roof 3  |